.jpg)


Project Name | Memorial Hall of the Fourth National Congress of the Communist Party of China | Project Introduction | 1. Two screens are used in the project, and specific materials are played point-to-point, clear and undamaged. The Cassida control system ensures the perfect effect of the exhibition hall. |
---|---|---|---|
Project Date | 2021.05 | Equipment used | LS16、G616C*57、G612C*22 |
Project Location | Shanghai | Project Requirements | Point to point playback, good photographing effect, no scanning line and no Caton |
View all cases
-
Jiahong revitalization Center
Project Name:Jiahong revitalization Center
Project Date:2021.08
Project Location:Dongguan City, Guangdong Province
Project Introduction:1. The three screens display different images respectively 2 p1. 58 small spacing screen
-
Southeast smart city, Shijiazhuang City, Hebei Province
Project Name:Southeast smart city, Shijiazhuang City, Hebei Province
Project Date:2021.07
Project Location:Shijiazhuang City, Hebei Province
Project Introduction:Three outdoor screens, a transparent screen, two grille screens and a super large sky screen.
-
Round cake screen of exhibition hall of Kunming Planning Museum, Yunnan
Project Name:Round cake screen of exhibition hall of Kunming Planning Museum, Yunnan
Project Date:2021.03
Project Location:Yunnan
Project Introduction:There is a 3.5m diameter round cake screen and special-shaped plate in the exhibition hall.
-
Jiangsu Greenland ideal city exhibition hall
Project Name:Jiangsu Greenland ideal city exhibition hall
Project Date:2020.09
Project Location:Jiangsu
Project Introduction:P2. 5 module front screen resolution 3840 × 1152 ground screen resolution 3840 × one thousand three hundred and forty-four
-
Heilongjiang Heihe huma TV studio
Project Name:Heilongjiang Heihe huma TV studio
Project Date:2021.03
Project Location:Heilongjiang
Project Introduction:One main screen on the front and one ear screen on both sides.
-
Hangzhou China mobile exhibition hall
Project Name:Hangzhou China mobile exhibition hall
Project Date:2020.01
Project Location:Hangzhou
Project Introduction:Curved screen display
-
Hebei publishing media group
Project Name:Hebei publishing media group
Project Date:2022.04
Project Location:Shijiazhuang, Hebei
Project Introduction:1. Point spacing 1.53 module, left screen 5408*1872, main screen 14144*1560, floor tile screen 3226*1176, long screen 5504*334, right LCD 6*3. Two sets of F2 are used for cascade control to realize the unified management of all screens.
-
Haier group international exhibition hall
Project Name:Haier group international exhibition hall
Project Date:2018.09
Project Location:Shandong
Project Introduction:Two servers have unified control over 20 screens to achieve complete point-to-point display. One plays 16 videos at the same time, while the other plays 9 videos at the same time.
-
Jiangsu century edge wedding Art Center
Project Name:Jiangsu century edge wedding Art Center
Project Date:2020.03
Project Location:Jiangsu
Project Introduction:P2. 5 ordinary brush, 35 long, 43 high, screen resolution 4480 * 2240, semicircular