


Project Name | Auspicious Hyatt Regency Daqing, Heilongjiang Province | Project Introduction | P4, 12320*1520, 13 screens open at the same time, and switch and play |
---|---|---|---|
Project Date | 2020.07 | Equipment used | U3Pro×2,G616×163,Kommander F2×1。 |
Project Location | DaQing | Project Requirements | 1. Use extended mode to play pictures, videos, PPT and so on in a loop on a large screen. To display them synchronously, 13 Windows are needed. 2. The customer requires that all screen videos be on a level surface. 3. More than 13 screens are requir |
View all cases
-
Zhejiang Taizhou Laoshui plant
Project Name:Zhejiang Taizhou Laoshui plant
Project Date:2021.07
Project Location:Taizhou City, Zhejiang Province
Project Introduction:The space-time corridor, wall surface, top surface and column form a whole
-
Guizhou liuzhi project
Project Name:Guizhou liuzhi project
Project Date:2019.12
Project Location:Guizhou
Project Introduction:P4 arch screen, each arch is 128 points wide and 3286 points long, forming an arch tunnel.
-
Xi 'an national digital publishing house
Project Name:Xi 'an national digital publishing house
Project Date:2018.11
Project Location:Xi 'an
Project Introduction:The home screen2816*512
-
Shenzhen Nanshan site Beiyou Technology Building
Project Name:Shenzhen Nanshan site Beiyou Technology Building
Project Date:2021.08
Project Location:Shenzhen City, Guangdong Province
Project Introduction:P2 - five sided immersion design, five sided tunnel display combined with conventional version and special-shaped plate.
-
Haier group international exhibition hall
Project Name:Haier group international exhibition hall
Project Date:2018.09
Project Location:Shandong
Project Introduction:Two servers have unified control over 20 screens to achieve complete point-to-point display. One plays 16 videos at the same time, while the other plays 9 videos at the same time.
-
Jiangsu Greenland ideal city exhibition hall
Project Name:Jiangsu Greenland ideal city exhibition hall
Project Date:2020.09
Project Location:Jiangsu
Project Introduction:P2. 5 module front screen resolution 3840 × 1152 ground screen resolution 3840 × one thousand three hundred and forty-four
-
Weifang xiguanting village exhibition hall
Project Name:Weifang xiguanting village exhibition hall
Project Date:2020.11
Project Location:Weifang, Shandong
Project Introduction:One arc giant screen, seven long vertical screens, and three large screens of sand table.
-
Jiaoling longevity of the township some exhibition hall
Project Name:Jiaoling longevity of the township some exhibition hall
Project Date:2020.07
Project Location:MeiZhou
Project Introduction:One round awning 2496*2496, seven modeling screens 1760*270/1760*270/2112*330/2112*330/2640*420/2640*420/2640*420 *420
-
Memorial Hall of the Fourth National Congress of the Communist Party of China
Project Name:Memorial Hall of the Fourth National Congress of the Communist Party of China
Project Date:2021.05
Project Location:Shanghai
Project Introduction:1. Two screens are used in the project, and specific materials are played point-to-point, clear and undamaged. The Cassida control system ensures the perfect effect of the exhibition hall.