
Project Name | Heilongjiang Heihe huma TV studio | Project Introduction | One main screen on the front and one ear screen on both sides. |
---|---|---|---|
Project Date | 2021.03 | Equipment used | KS9000,Kommander F2,ES4*9,G612C*138 |
Project Location | Heilongjiang | Project Requirements | 1. The project uses 4K splicing of graphics card, which requires point-to-point display and smooth large screen playback without jamming. 2. Using high brush chip, through the debugging of kaishida software, 3840 refresh is achieved, the picture output i |
View all cases
-
Jiahong revitalization Center
Project Name:Jiahong revitalization Center
Project Date:2021.08
Project Location:Dongguan City, Guangdong Province
Project Introduction:1. The three screens display different images respectively 2 p1. 58 small spacing screen
-
Electric Power Research Division of Hebei electric power company
Project Name:Electric Power Research Division of Hebei electric power company
Project Date:2020.09
Project Location:Shijiazhuang City
Project Introduction:Full screen 4800 ✖ 4352,P2. 5。 A ks9800 with 20 outputs and 8 4K inputs realizes complete point-to-point display.
-
Jiangsu century edge wedding Art Center
Project Name:Jiangsu century edge wedding Art Center
Project Date:2020.03
Project Location:Jiangsu
Project Introduction:P2. 5 ordinary brush, 35 long, 43 high, screen resolution 4480 * 2240, semicircular
-
Rongchuang West Bay exhibition hall
Project Name:Rongchuang West Bay exhibition hall
Project Date:2021.08
Project Location:Xi'an City, Shaanxi Province
Project Introduction:2.5 sand table screen, large screen number 7752 * 4352
-
Zhejiang Feite Steel Structure Co., Ltd
Project Name:Zhejiang Feite Steel Structure Co., Ltd
Project Date:2022.09
Project Location:Hangzhou, Zhejiang Province
Project Introduction:1. 1 P3 module, screen points 6848 * 2176 2, 1 P2.5 module, screen points 8576 * 3200
-
Memorial Hall of the Fourth National Congress of the Communist Party of China
Project Name:Memorial Hall of the Fourth National Congress of the Communist Party of China
Project Date:2021.05
Project Location:Shanghai
Project Introduction:1. Two screens are used in the project, and specific materials are played point-to-point, clear and undamaged. The Cassida control system ensures the perfect effect of the exhibition hall.
-
Zhejiang Jiande daciyan Service Center
Project Name:Zhejiang Jiande daciyan Service Center
Project Date:2021.09
Project Location:Jiande City, Zhejiang Province
Project Introduction:Screen module, P2, l-fold
-
Weifang xiguanting village exhibition hall
Project Name:Weifang xiguanting village exhibition hall
Project Date:2020.11
Project Location:Weifang, Shandong
Project Introduction:One arc giant screen, seven long vertical screens, and three large screens of sand table.
-
Sand table of Xiangxi high tech Zone
Project Name:Sand table of Xiangxi high tech Zone
Project Date:2021.04
Project Location:Xiangxi City, Hunan Province
Project Introduction:1. The whole screen is 8320 * 1024, and one sv16 is loaded