
Project Name | Heilongjiang Heihe huma TV studio | Project Introduction | One main screen on the front and one ear screen on both sides. |
---|---|---|---|
Project Date | 2021.03 | Equipment used | KS9000,Kommander F2,ES4*9,G612C*138 |
Project Location | Heilongjiang | Project Requirements | 1. The project uses 4K splicing of graphics card, which requires point-to-point display and smooth large screen playback without jamming. 2. Using high brush chip, through the debugging of kaishida software, 3840 refresh is achieved, the picture output i |
View all cases
-
Exhibition hall of Beijing Pinggu chicken Incubation Park
Project Name:Exhibition hall of Beijing Pinggu chicken Incubation Park
Project Date:2021.05
Project Location:Beijing
Project Introduction:1. A main screen on the front
-
An exhibition hall in dongguan
Project Name:An exhibition hall in dongguan
Project Date:2020.01
Project Location:Dongguan
Project Introduction:Indoor P2.5 project, trapezoidal screen
-
Henan 10000 mu Lotus Garden
Project Name:Henan 10000 mu Lotus Garden
Project Date:2021.06
Project Location:Puyang City, Henan Province
Project Introduction:1. Use P2 dual input module to splice into tunnel screen
-
Jurong Wuyue Plaza KTV
Project Name:Jurong Wuyue Plaza KTV
Project Date:2020.09
Project Location:Jurong City, Jiangsu Province
Project Introduction:1. A door frame screen on the front covers the whole door frame. 2. There is a small screen on the left and right of the door channel.
-
Electric Power Research Division of Hebei electric power company
Project Name:Electric Power Research Division of Hebei electric power company
Project Date:2020.09
Project Location:Shijiazhuang City
Project Introduction:Full screen 4800 ✖ 4352,P2. 5。 A ks9800 with 20 outputs and 8 4K inputs realizes complete point-to-point display.
-
Guangdong Qingyuan Rocky Desert Park Science Popularization Center
Project Name:Guangdong Qingyuan Rocky Desert Park Science Popularization Center
Project Date:2022.04
Project Location:Qingyuan City, Guangdong
Project Introduction:1. An arc strip screen with a resolution of 12160 * 1536
-
Memorial Hall of the Fourth National Congress of the Communist Party of China
Project Name:Memorial Hall of the Fourth National Congress of the Communist Party of China
Project Date:2021.05
Project Location:Shanghai
Project Introduction:1. Two screens are used in the project, and specific materials are played point-to-point, clear and undamaged. The Cassida control system ensures the perfect effect of the exhibition hall.
-
Hangzhou 5G exhibition hall
Project Name:Hangzhou 5G exhibition hall
Project Date:2020.01
Project Location:Hangzhou
Project Introduction:The screen is a movable telescopic screen
-
Ziyang Yagu science and Innovation Park
Project Name:Ziyang Yagu science and Innovation Park
Project Date:2021.03
Project Location:Sichuan
Project Introduction:The project is an L-shaped immersion LED screen, which is centrally controlled by one Kommander F2 server and displayed point-to-point.