| Project Name | Spherical screen of a screen factory in Shenzhen | Project Introduction | The hemispherical screen is composed of three modules. There are two trapezoidal modules below, one circular module above, and one circular module is composed of four sector modules. |
|---|---|---|---|
| Project Date | 2020.09 | Equipment used | R12 |
| Project Location | Shenzhen | Project Requirements | The special-shaped structure is spliced through the software, and the mirror structure is made through the software, so that the picture can be displayed from inside to outside and connected with the following module picture. Virtual point zoom, zoom the |
View all cases
-
Changshu Zeus bar
Project Name:Changshu Zeus bar
Project Date:2021.04
Project Location:Changshu City, Jiangsu Province
Project Introduction:There are four sky curtains and two long screens on the left and right sides.
-
Ordos Kangbashi sweat factory bar
Project Name:Ordos Kangbashi sweat factory bar
Project Date:2020.11
Project Location:erdos
Project Introduction:Point to point display and unified broadcast control
-
Yan'an Wuqi science and Technology Museum
Project Name:Yan'an Wuqi science and Technology Museum
Project Date:2020.09
Project Location:Yan'an
Project Introduction:1. An arched screen on the front with a resolution of 2688 * 3008 2 Surrounded by an ultra long strip screen, surrounded by three sides, with a resolution of 45952 * 896 3 An arc screen, resolution: 3840 * 1024 4 The two circles are called
-
Riverside Hotel
Project Name:Riverside Hotel
Project Date:2020.12
Project Location:Ji'an City, Jiangxi Province
Project Introduction:1. One main screen and four auxiliary screens on the stage, and one ceiling screen on the top of the hall; 2. Indoor P3, main screen 3840x1728, four side screens 896x1728 and sky curtain 4736x2816.
-
Magic cube screen, Vientiane City, Shantou City, Guangdong Province
Project Name:Magic cube screen, Vientiane City, Shantou City, Guangdong Province
Project Date:2021.09
Project Location:Shantou City, Guangdong Province
Project Introduction:The project site uses 85 sets of 5 large magic cube screens + 55 sets of 5 small magic cube screens, with a total of 140 ceiling magic cube screens.
-
Chongqing West Railway Station - Chongqing eye City Exhibition Hall
Project Name:Chongqing West Railway Station - Chongqing eye City Exhibition Hall
Project Date:2022.01
Project Location:Chongqing
Project Introduction:1.4 projectors 2 A curved front uses two projectors 3 Two projectors for one ground 4 Projection fusion display complete picture 5 Central control light, LCD screen, projection
-
Beijing banana ring KTV phase II
Project Name:Beijing banana ring KTV phase II
Project Date:2021.06
Project Location:Beijing
Project Introduction:1. Each room has a ceiling screen, round or rectangular 2 There will be irregular shaped screens on some walls of the room.
-
Xincaichen Nanning (under construction) factory
Project Name:Xincaichen Nanning (under construction) factory
Project Date:2021.11
Project Location:Nanning City, Guangxi Province
Project Introduction:P2-3m diameter ball module, fm6353-5958-40s, nine special-shaped modules, spherical screen, box installation.
-
Guizhou Xingyihua Music Bar
Project Name:Guizhou Xingyihua Music Bar
Project Date:2022.07
Project Location:Xingyi City, Guizhou Province
Project Introduction:Bar screen is divided into main screen, sky screen, side screen, strip screen and outdoor strip screen.