
.jpg)
Project Name | Guangdong Qingyuan Rocky Desert Park Science Popularization Center | Project Introduction | 1. An arc strip screen with a resolution of 12160 * 1536 |
---|---|---|---|
Project Date | 2022.04 | Equipment used | F2,KS9800,KLS4*8,G612*200 |
Project Location | Qingyuan City, Guangdong | Project Requirements | 1. Use one set of ks9800 splicing control to ensure point-to-point display; 2. Use color restoration technology to ensure large screen HD image quality. |
View all cases
-
Jilin University Town studio
Project Name:Jilin University Town studio
Project Date:2021.12
Project Location:Jilin City, Jilin Province
Project Introduction:Side screen 1280 × 2048 two, main screen 5440 × 2048, total resolution 8000 × 2048.
-
Shandong Jinan Shangang Party Construction Exhibition Hall
Project Name:Shandong Jinan Shangang Party Construction Exhibition Hall
Project Date:2021.05
Project Location:Jinan City, Shandong Province
Project Introduction:1. One main screen and two screens are on the front, with a total number of points of 4608 * 1664 2 On the back is 5 vertical strip screens, with a total number of 2624 * 3328 points.
-
Baotou City Planning Exhibition Hall
Project Name:Baotou City Planning Exhibition Hall
Project Date:2021.12
Project Location:Inner Mongolia
Project Introduction:Separate scene, inner arc projection fusion
-
Tianjin Ninghe Citizen Square Exhibition Hall
Project Name:Tianjin Ninghe Citizen Square Exhibition Hall
Project Date:2022.07
Project Location:Ninghe District, Tianjin
Project Introduction:1. Two U-shaped strip screens on the front 2. One interactive ground screen
-
Hebei Tangshan Qian'an Tangshan special steel
Project Name:Hebei Tangshan Qian'an Tangshan special steel
Project Date:2021.08
Project Location:Tangshan City, Hebei Province
Project Introduction:The large 4K curved screen in the exhibition hall of Qian'an Tangshan special steel enterprise uses ks9800 video processor. Ks9800 video processor supports kystar frame synchronization (KFS) technology, which can ensure the complete frame synchronization
-
Suzhou e-sports hall
Project Name:Suzhou e-sports hall
Project Date:2019.11
Project Location:Suzhou
Project Introduction:a KS8000
-
China military museum
Project Name:China military museum
Project Date:2020.01
Project Location:Beijing
Project Introduction:Four cylinder screens, divided into two large cylinders and two small cylinders
-
Rongchuang West Bay exhibition hall
Project Name:Rongchuang West Bay exhibition hall
Project Date:2021.08
Project Location:Xi'an City, Shaanxi Province
Project Introduction:2.5 sand table screen, large screen number 7752 * 4352
-
Zhejiang Taizhou Laoshui plant
Project Name:Zhejiang Taizhou Laoshui plant
Project Date:2021.07
Project Location:Taizhou City, Zhejiang Province
Project Introduction:The space-time corridor, wall surface, top surface and column form a whole