
.png)


Project Name | Zhangjiagang Sinosoft group headquarters exhibition hall | Project Introduction | 1. The resolution of the main screen of the front door is 5760 * 2560, and the resolution of the two column screens are 3840 * 2160 respectively; 2. There are 8 P2 displays in the inner hall, with resolutions of 2 1760 * 1280, 3 2240 * 1280, 2 2400 * 1280 |
---|---|---|---|
Project Date | 2021.05 | Equipment used | Kommander F2*3,KS9800*2,Kapollo *3 |
Project Location | Zhangjiagang City, Jiangsu Province | Project Requirements | 1. Screens of different specifications can be centrally controlled and managed by cloud control 2. Multiple videos or pictures can be played circularly 3. Ensure the display effect, and all screens are displayed point-to-point. 4. The power supply need |
View all cases
-
Jiahong revitalization Center
Project Name:Jiahong revitalization Center
Project Date:2021.08
Project Location:Dongguan City, Guangdong Province
Project Introduction:1. The three screens display different images respectively 2 p1. 58 small spacing screen
-
Chongqing West Railway Station - Chongqing eye City Exhibition Hall
Project Name:Chongqing West Railway Station - Chongqing eye City Exhibition Hall
Project Date:2022.01
Project Location:Chongqing
Project Introduction:1.4 projectors 2. A curved front uses two projectors 3 .Two projectors for one ground 4 Projection fusion display complete picture 5 Central control light, LCD screen, projection
-
Jiaoling longevity of the township some exhibition hall
Project Name:Jiaoling longevity of the township some exhibition hall
Project Date:2020.07
Project Location:MeiZhou
Project Introduction:One round awning 2496*2496, seven modeling screens 1760*270/1760*270/2112*330/2112*330/2640*420/2640*420/2640*420 *420
-
Henan 10000 mu Lotus Garden
Project Name:Henan 10000 mu Lotus Garden
Project Date:2021.06
Project Location:Puyang City, Henan Province
Project Introduction:1. Use P2 dual input module to splice into tunnel screen
-
The western gold
Project Name:The western gold
Project Date:2020.01
Project Location:Urumqi, xinjiang
Project Introduction:2688x1152,P2.5
-
Hebei Gaobeidian Shanhe formation mould center
Project Name:Hebei Gaobeidian Shanhe formation mould center
Project Date:2020.09
Project Location:Hebei
Project Introduction:Full screen 3200 ✖ 3968, high tech P2 5。 One sv16 + T1 to realize complete point-to-point display.
-
Shenzhen Nanshan site Beiyou Technology Building
Project Name:Shenzhen Nanshan site Beiyou Technology Building
Project Date:2021.08
Project Location:Shenzhen City, Guangdong Province
Project Introduction:P2 - five sided immersion design, five sided tunnel display combined with conventional version and special-shaped plate.
-
Suzhou e-sports hall
Project Name:Suzhou e-sports hall
Project Date:2019.11
Project Location:Suzhou
Project Introduction:a KS8000
-
Memorial Hall of the Fourth National Congress of the Communist Party of China
Project Name:Memorial Hall of the Fourth National Congress of the Communist Party of China
Project Date:2021.05
Project Location:Shanghai
Project Introduction:1. Two screens are used in the project, and specific materials are played point-to-point, clear and undamaged. The Cassida control system ensures the perfect effect of the exhibition hall.