
Project Name | Heilongjiang Heihe huma TV studio | Project Introduction | One main screen on the front and one ear screen on both sides. |
---|---|---|---|
Project Date | 2021.03 | Equipment used | KS9000,Kommander F2,ES4*9,G612C*138 |
Project Location | Heilongjiang | Project Requirements | 1. The project uses 4K splicing of graphics card, which requires point-to-point display and smooth large screen playback without jamming. 2. Using high brush chip, through the debugging of kaishida software, 3840 refresh is achieved, the picture output i |
View all cases
-
Guizhou liuzhi project
Project Name:Guizhou liuzhi project
Project Date:2019.12
Project Location:Guizhou
Project Introduction:P4 arch screen, each arch is 128 points wide and 3286 points long, forming an arch tunnel.
-
Rongchuang West Bay exhibition hall
Project Name:Rongchuang West Bay exhibition hall
Project Date:2021.08
Project Location:Xi'an City, Shaanxi Province
Project Introduction:2.5 sand table screen, large screen number 7752 * 4352
-
Jiangxi Fuzhou Wanxiang Xinyuan science and technology wisdom exhibition hall
Project Name:Jiangxi Fuzhou Wanxiang Xinyuan science and technology wisdom exhibition hall
Project Date:2022.04
Project Location:Fuzhou, Jiangxi
Project Introduction:1. Exhibition hall 8 P1 86 screen
-
Chongqing West Railway Station - Chongqing eye City Exhibition Hall
Project Name:Chongqing West Railway Station - Chongqing eye City Exhibition Hall
Project Date:2022.01
Project Location:Chongqing
Project Introduction:1.4 projectors 2. A curved front uses two projectors 3 .Two projectors for one ground 4 Projection fusion display complete picture 5 Central control light, LCD screen, projection
-
Baishi Golden Valley Exhibition Hall naked eye 3D
Project Name:Baishi Golden Valley Exhibition Hall naked eye 3D
Project Date:2021.03
Project Location:Beijing
Project Introduction:1. Through the way of modeling screen (left, middle, right and bottom, four screens), 2 Through the division and reorganization function of F2 server, the video is corresponding to four screens one by one to make 3D effect.
-
Shenzhen yishijie factory
Project Name:Shenzhen yishijie factory
Project Date:2021.04
Project Location:Shenzhen
Project Introduction:P3-mbi5124-138-32s-2.5m diameter horn screen, special-shaped plate
-
Chutian medicine exhibition hall
Project Name:Chutian medicine exhibition hall
Project Date:2021.11
Project Location:Ningxiang City, Hunan Province
Project Introduction:4K large screen
-
Haier group international exhibition hall
Project Name:Haier group international exhibition hall
Project Date:2018.09
Project Location:Shandong
Project Introduction:Two servers have unified control over 20 screens to achieve complete point-to-point display. One plays 16 videos at the same time, while the other plays 9 videos at the same time.
-
Exhibition hall of bonded port area
Project Name:Exhibition hall of bonded port area
Project Date:2020.12
Project Location:Ningbo City, Zhejiang Province
Project Introduction:1. Ultra long screen approximate point-to-point display; 2. One slide control screen; 3.. Unified broadcast control of multi screen display.