

Project Name | Jurong Wuyue Plaza KTV | Project Introduction | 1. A door frame screen on the front covers the whole door frame. 2. There is a small screen on the left and right of the door channel. |
---|---|---|---|
Project Date | 2020.09 | Equipment used | LS16*1,G616*57 |
Project Location | Jurong City, Jiangsu Province | Project Requirements | 1. Centralized control by one computer; 2. Play smoothly without jamming, and the picture quality is clear and smooth; 3. With 3D materials, it has the effect of naked eye 3D. |
View all cases
-
Auspicious Hyatt Regency Daqing, Heilongjiang Province
Project Name:Auspicious Hyatt Regency Daqing, Heilongjiang Province
Project Date:2020.07
Project Location:DaQing
Project Introduction:P4, 12320*1520, 13 screens open at the same time, and switch and play
-
Exhibition hall of Beijing Pinggu chicken Incubation Park
Project Name:Exhibition hall of Beijing Pinggu chicken Incubation Park
Project Date:2021.05
Project Location:Beijing
Project Introduction:1. A main screen on the front
-
Bright investment wisdom City some exhibition center
Project Name:Bright investment wisdom City some exhibition center
Project Date:2020.07
Project Location:ShenZhen
Project Introduction:LED screen 1 L type 1536* 2432,12 LCD, 1 projection, 2 audio, HDMI to SDI converter
-
National phosphorus resources development and Utilization Engineering Technology Research Center
Project Name:National phosphorus resources development and Utilization Engineering Technology Research Center
Project Date:2021.03
Project Location:Yunnan
Project Introduction:1. A horn cylindrical screen in the exhibition hall of the research center
-
Shenzhen Nanshan site Beiyou Technology Building
Project Name:Shenzhen Nanshan site Beiyou Technology Building
Project Date:2021.08
Project Location:Shenzhen City, Guangdong Province
Project Introduction:P2 - five sided immersion design, five sided tunnel display combined with conventional version and special-shaped plate.
-
Shanghai Baoshan hotel lobby
Project Name:Shanghai Baoshan hotel lobby
Project Date:2021.08
Project Location:Baoshan District, Shanghai
Project Introduction:Thirty four rhombic screens are arranged in two rows, one with 17 rhombic screens
-
The western gold
Project Name:The western gold
Project Date:2020.01
Project Location:Urumqi, xinjiang
Project Introduction:2688x1152,P2.5
-
Fujian Xiamen International Center
Project Name:Fujian Xiamen International Center
Project Date:2022.02
Project Location:Xiamen City, Fujian Province
Project Introduction:Vertical arc screen
-
Jiangsu Greenland ideal city exhibition hall
Project Name:Jiangsu Greenland ideal city exhibition hall
Project Date:2020.09
Project Location:Jiangsu
Project Introduction:P2. 5 module front screen resolution 3840 × 1152 ground screen resolution 3840 × one thousand three hundred and forty-four