

Project Name | Guizhou Xishui Junpin international KTV tree screen | Project Introduction | Indoor P4 soft module to assemble a tree screen |
---|---|---|---|
Project Date | 2021.06 | Equipment used | LS2、G612e*51 |
Project Location | Zunyi City, Guizhou Province | Project Requirements | 1. Use one computer for centralized control and play smoothly without jamming; 2. Modules in irregular places need hub port offset. |
View all cases
-
Stair screen of Pingdu Zhongjie square overpass
Project Name:Stair screen of Pingdu Zhongjie square overpass
Project Date:2021.06
Project Location:Pingdu City, Shandong Province
Project Introduction:Whole stair screen
-
Hebei Cangzhou Nanpi radio and television station
Project Name:Hebei Cangzhou Nanpi radio and television station
Project Date:2021.12
Project Location:Cangzhou City, Hebei Province
Project Introduction:A total of 22 screens to achieve full point-to-point display
-
Riverside Hotel
Project Name:Riverside Hotel
Project Date:2020.12
Project Location:Ji'an City, Jiangxi Province
Project Introduction:1. One main screen and four auxiliary screens on the stage, and one ceiling screen on the top of the hall; 2. Indoor P3, main screen 3840x1728, four side screens 896x1728 and sky curtain 4736x2816.
-
Advertising display screen of wanxianghui shopping mall in Nanchang City, Jiangxi Province
Project Name:Advertising display screen of wanxianghui shopping mall in Nanchang City, Jiangxi Province
Project Date:2021.05
Project Location:Nanchang City, Jiangxi Province
Project Introduction:Ten Rubik's cube screens are displayed on three sides at the bottom of the front and back, with a total of 26 sides.
-
A bar in Zunyi
Project Name:A bar in Zunyi
Project Date:2020.07
Project Location:Zunyi
Project Introduction:Control all LED screens with effects on the Resolume software
-
Datang network exhibition hall
Project Name:Datang network exhibition hall
Project Date:2020.12
Project Location:Jinan City, Shandong Province
Project Introduction:Special shaped triangular module, three sides of the whole screen.
-
Guizhou Daozhen bar
Project Name:Guizhou Daozhen bar
Project Date:2021.01
Project Location:Daozhen County, Guizhou
Project Introduction:1. One main screen on the front, vertical bar screen on the side, and multiple triangular screens on the ceiling.
-
Beijing banana ring KTV phase II
Project Name:Beijing banana ring KTV phase II
Project Date:2021.06
Project Location:Beijing
Project Introduction:1. Each room has a ceiling screen, round or rectangular 2 There will be irregular shaped screens on some walls of the room.
-
Shenling ring, Foshan, Guangdong
Project Name:Shenling ring, Foshan, Guangdong
Project Date:2022.04
Project Location:Foshan, Guangdong
Project Introduction:1. Three trapezoidal modules; 2. Load with sv8p + g616c; 3. One box and one card