
Project Name | Urumqi shenma bar | Project Introduction | The large screen has a resolution of 1280x1280, which is a special-shaped screen of peach heart and rotated by 45 |
---|---|---|---|
Project Date | 2020.01 | Equipment used | SV4Pro,G612 |
Project Location | Urumqi | Project Requirements | 1. Save costs 2. Rotate the display screen by 45° 3. Simple operation and easy to use |
View all cases
-
A bar in Zunyi
Project Name:A bar in Zunyi
Project Date:2020.07
Project Location:Zunyi
Project Introduction:Control all LED screens with effects on the Resolume software
-
Guangdong Yangjiang bar
Project Name:Guangdong Yangjiang bar
Project Date:2021.05
Project Location:Yangjiang City, Guangdong Province
Project Introduction:1. There is a main screen on the front and a DJ Table 2 Two ring screen 3 Long screen around.
-
Circular screen of industrial and Commercial Bank of China
Project Name:Circular screen of industrial and Commercial Bank of China
Project Date:2021.03
Project Location:Beijing
Project Introduction: Special-shaped splicing
-
Shenyang wedding hotel
Project Name:Shenyang wedding hotel
Project Date:2020.01
Project Location:Shenyang
Project Introduction:Nine door screens and one canopy
-
Xincaichen Nanning (under construction) factory
Project Name:Xincaichen Nanning (under construction) factory
Project Date:2021.11
Project Location:Nanning City, Guangxi Province
Project Introduction:P2-3m diameter ball module, fm6353-5958-40s, nine special-shaped modules, spherical screen, box installation.
-
Magic cube screen, Vientiane City, Shantou City, Guangdong Province
Project Name:Magic cube screen, Vientiane City, Shantou City, Guangdong Province
Project Date:2021.09
Project Location:Shantou City, Guangdong Province
Project Introduction:The project site uses 85 sets of 5 large magic cube screens + 55 sets of 5 small magic cube screens, with a total of 140 ceiling magic cube screens.
-
Beijing banana ring KTV phase II
Project Name:Beijing banana ring KTV phase II
Project Date:2021.06
Project Location:Beijing
Project Introduction:1. Each room has a ceiling screen, round or rectangular 2 There will be irregular shaped screens on some walls of the room.
-
Shenyang wedding hotel
Project Name:Shenyang wedding hotel
Project Date:2020.01
Project Location:Shenyang
Project Introduction:Four pillar screens, four side screens, one awning
-
Zhuhai sanxi kechuang town
Project Name:Zhuhai sanxi kechuang town
Project Date:2018.03
Project Location:Guangdong zhuhai
Project Introduction:This project is composed of P3 conventional screen and P4 floor tile screen, two pieces are spliced together to form an l-shaped screen