



Project Name | Zhejiang Jiande daciyan Service Center | Project Introduction | Screen module, P2, l-fold |
---|---|---|---|
Project Date | 2021.09 | Equipment used | KSV24,G616C*84 |
Project Location | Jiande City, Zhejiang Province | Project Requirements | 1. Point to point display; 2. Play smoothly without jamming, and the picture quality is clear and smooth; 3. One computer is used for centralized control, and the playback is smooth without jamming. |
View all cases
-
Ziyang Yagu science and Innovation Park
Project Name:Ziyang Yagu science and Innovation Park
Project Date:2021.03
Project Location:Sichuan
Project Introduction:The project is an L-shaped immersion LED screen, which is centrally controlled by one Kommander F2 server and displayed point-to-point.
-
Sand table of Xiangxi high tech Zone
Project Name:Sand table of Xiangxi high tech Zone
Project Date:2021.04
Project Location:Xiangxi City, Hunan Province
Project Introduction:1. The whole screen is 8320 * 1024, and one sv16 is loaded
-
The western gold
Project Name:The western gold
Project Date:2020.01
Project Location:Urumqi, xinjiang
Project Introduction:2688x1152,P2.5
-
Shenzhen Nanshan site Beiyou Technology Building
Project Name:Shenzhen Nanshan site Beiyou Technology Building
Project Date:2021.08
Project Location:Shenzhen City, Guangdong Province
Project Introduction:P2 - five sided immersion design, five sided tunnel display combined with conventional version and special-shaped plate.
-
An exhibition hall in mumbai, India
Project Name:An exhibition hall in mumbai, India
Project Date:2020.01
Project Location:Mumbai, India
Project Introduction:11 LCD screens are irregularly spliced
-
Henan 10000 mu Lotus Garden
Project Name:Henan 10000 mu Lotus Garden
Project Date:2021.06
Project Location:Puyang City, Henan Province
Project Introduction:1. Use P2 dual input module to splice into tunnel screen
-
Chongqing Chang'an immersive LED display
Project Name:Chongqing Chang'an immersive LED display
Project Date:2020.12
Project Location:Chongqing
Project Introduction:5 screens, front can be opened or closed
-
Shandong Jinan Shangang Party Construction Exhibition Hall
Project Name:Shandong Jinan Shangang Party Construction Exhibition Hall
Project Date:2021.05
Project Location:Jinan City, Shandong Province
Project Introduction:1. One main screen and two screens are on the front, with a total number of points of 4608 * 1664 2 On the back is 5 vertical strip screens, with a total number of 2624 * 3328 points.
-
Heze Ski Resort
Project Name:Heze Ski Resort
Project Date:2020.09
Project Location:Heze City, Shandong Province
Project Introduction:Tunnel screen, module p3-2038s, tunnel screen is 5696x2816 long, and another half of the round screen is the top of the tunnel.