
Project Name | Shangyu HP Plaza exhibition hall | Project Introduction | Immersive display with four screens |
---|---|---|---|
Project Date | 2021.01 | Equipment used | KS9000,ES4×5,G612C×92,Kommander F2 |
Project Location | Shangyu City, Zhejiang Province | Project Requirements | 1. Centralized control by one computer; 2. Play smoothly without jamming, and the picture quality is clear and smooth; 3. Whole screen point-to-point display. |
View all cases
-
Electric Power Research Division of Hebei electric power company
Project Name:Electric Power Research Division of Hebei electric power company
Project Date:2020.09
Project Location:Shijiazhuang City
Project Introduction:Full screen 4800 ✖ 4352,P2. 5。 A ks9800 with 20 outputs and 8 4K inputs realizes complete point-to-point display.
-
Haier group international exhibition hall
Project Name:Haier group international exhibition hall
Project Date:2018.09
Project Location:Shandong
Project Introduction:Two servers have unified control over 20 screens to achieve complete point-to-point display. One plays 16 videos at the same time, while the other plays 9 videos at the same time.
-
Zhejiang Feite Steel Structure Co., Ltd
Project Name:Zhejiang Feite Steel Structure Co., Ltd
Project Date:2022.09
Project Location:Hangzhou, Zhejiang Province
Project Introduction:1. 1 P3 module, screen points 6848 * 2176 2, 1 P2.5 module, screen points 8576 * 3200
-
Shandong Jinan Shangang Party Construction Exhibition Hall
Project Name:Shandong Jinan Shangang Party Construction Exhibition Hall
Project Date:2021.05
Project Location:Jinan City, Shandong Province
Project Introduction:1. One main screen and two screens are on the front, with a total number of points of 4608 * 1664 2 On the back is 5 vertical strip screens, with a total number of 2624 * 3328 points.
-
Memorial Hall of the Fourth National Congress of the Communist Party of China
Project Name:Memorial Hall of the Fourth National Congress of the Communist Party of China
Project Date:2021.05
Project Location:Shanghai
Project Introduction:1. Two screens are used in the project, and specific materials are played point-to-point, clear and undamaged. The Cassida control system ensures the perfect effect of the exhibition hall.
-
Zhejiang Shengqi technology exhibition hall Co., Ltd
Project Name:Zhejiang Shengqi technology exhibition hall Co., Ltd
Project Date:2021.08
Project Location:Hangzhou City, Zhejiang Province
Project Introduction:Four displays of different sizes
-
Hangzhou a unit exhibition hall
Project Name:Hangzhou a unit exhibition hall
Project Date:2020.01
Project Location:Hangzhou
Project Introduction:Circular screen, using modeling and video to create 3D effect
-
Chongqing Wushan Motianling Immersion Project
Project Name:Chongqing Wushan Motianling Immersion Project
Project Date:2022.06
Project Location:Chongqing City
Project Introduction:1.2 Immersive point-to-point display on the panel 2. Tablet cloud control
-
Jilin University Town studio
Project Name:Jilin University Town studio
Project Date:2021.12
Project Location:Jilin City, Jilin Province
Project Introduction:Side screen 1280 × 2048 two, main screen 5440 × 2048, total resolution 8000 × 2048.